Saudi Landbridge Railway Project – Section 2 – 271-1260 km

//Saudi Landbridge Railway Project – Section 2 – 271-1260 km
Saudi Landbridge Railway Project – Section 2 – 271-1260 km 2017-09-04T09:38:21+00:00

Project Description

PROJECT Saudi Landbridge Railway Project – Section 2 – 271-1260 km
CATEGORY                              RAILWAY INFRASTRUCTURES
SERVICES PROVIDED Concept design and Preliminary design
LOCATION Kingdom of Saudi Arabia
PROJECT DURATION       2015-2016
CLIENT Italferr S.p.A.

The Saudi Landbridge Railway Project consists of a circa 1300 km railway line linking Jeddah with the existing Riyadh and Dammam railway networks. It is intended to be a mixed freight and passenger non-electrified railway line. Design speed is 350km/h for passenger trains and 160km/h for freight trains. During the Concept phase, Coding provided the study of the corridor, the design of the alignment and of all civil works along the “Blue Corridor”, from km 271 to km 1300. During the Preliminary Phase Coding performed the design of the section, 640 km long, from km 271 to junction for Riyadh city.