PROJECT | Rome Metro Line C – Piazza Mirti Station |
CATEGORY | UNDERGROUND STRUCTURES |
SERVICES PROVIDED | Detailed design Engineering services during construction |
LOCATION | Rome – Italy |
PROJECT DURATION | 2006-2011 |
CLIENT | Metro C S.c.p.A. |
PROJECT VALUE | € 15 595 000.00 |
Preliminary, detailed design and engineering services during construction of the underground metro station “Mirti” of the C metro line of Rome. The excavation is 67×52 square meter large. It will be supported by 1.0m thick concrete diaphragms. Internal horizontal support is provided by five slabs (up to 31m deep) which will be cast in place during the top-down excavation in order to improve the stability.