Project Description
PROJECT | Rome Metro Line C – Torre Maura Station |
CATEGORY | UNDERGROUND STRUCTURES |
SERVICES PROVIDED | Detailed design Engineering services during construction |
LOCATION | Rome – Italy |
PROJECT DURATION | 2007-2011 |
CLIENT | Metro C S.c.p.A. |
PROJECT VALUE | € 15 630 000.00 |
Engineering services during construction of the underground metro station “Giglioli-Torre Maura” of the C metro line of Rome. The excavation is 120×60 square meter large and 30m deep. Internal horizontal support is provided by six slabs (REP trusts) which will be cast in place during the top-down excavation.