Project Description
PROJECT | Briga Novarese-Gozzano – Upgrading of the Railway Line |
CATEGORY | RAILWAY INFRASTRUCTURES |
SERVICES PROVIDED | Preliminary design |
LOCATION | Novara – Italy |
PROJECT DURATION | 2013-2016 |
CLIENT | RFI Rete Ferroviaria Italiana |
PROJECT VALUE | € 3 500 000.00 |
Preliminary design on behalf of RFI: Removal of three railway level crossings in Briga Novarese and Gozzano cities. Two of them at km 33+548 and 34+002 are solved by the construction of a new connection road, whereas the last one at km 34+002 is solved by an underpass.